SUMMARY

A chartered Civil Engineer certified by the Professional Regulation Commission (PRC), Philippines. A regular member of the Philippine Institute of Civil Engineers, Associate Engineer of Saudi Council of Engineers and approved affiliated member of Society Of Engineers in UAE.

In last 2003 I completed my five year bachelor’s degree in Civil Engineering at Southern Mindanao Colleges, Pagadian City, Zamboanga del Sur, Philippines. Took and passed the civil engineering licensure examination with the average rate of 81.95% given by the Professional Regulation Commission (PRC), held in Cagayan de Oro City, Philippines. Last November 2006.

I have a total of 14 years of experience in my professional career, including quantity surveying, estimating, costing, cost control, civil design, construction scheduling and project supervision in both engineering and construction.

Extensive experienced in pre-contract types of projects such as roads, highway interchange, bridges, underground structures, drainage, underground electrical utilities, site preparation (massive earthworks and grade leveling), sewerage treatment facilities, potable water tank, pumping station, pipeline and irrigation, power distribution and telecommunication, substations, government school buildings and offices, mosque, medical clinic, residential and commercial building (low and high rise), district cooling plants and warehouses.

Extensive experienced in post contract types of projects such as roads, highway interchange, bridges, underground structures, drainage, road repair and rehabilitation, reclamation, underground electrical utilities, industrial structures (pre-heater and clinker silo), site preparation (massive earthworks and grade leveling), government school buildings and offices, international convention center, mosque, medical clinic, on the ground helipad, residential and commercial building (low rise), and district cooling plants.

Proficient in engineering software such as MS Office, Mathcad, Auto-Cad, Auto-CAD Civil 3D, Infraworks360, CCS Candy and Primavera 6. Familiar with the standard measurements and contract form such as CESMM3, POMI, NRM and FIDIC1999.

SPECIALTIES

Engineering – Construction Schedule, Taking Off Quantities, Detailed Cost Estimates, Final Cost Estimates, Value Engineering, Tender Analysis, Earthworks (Civil3D), Site Grade Design and Road/Highway Design (Civil3D).

Construction – Construction Schedule, Taking Off Quantities, Detailed Cost Estimates, Final Cos Estimates, Progress Payment Certificates/Breakdown, Cost Comparison, Cost Control, Change Request/Variation Order, Value Engineering, Earthworks for Site Preparation and Road Works (Civil3D).

PROFESSIONAL EXPERIENCE

Perfection Construction LLC/Perfection Metal Industries LLC
Dubai, United Arab Emirates
Lead Estimator, May 2017 – Present

Projects – Pre-contract:
• Dubai Logistics City – Staff Village, Dubai.
• Proposed G + M Majid Tejara Al Aboat Plastic, Shed 2 On Plot No. 07, Umm Al Quwain.
• Construction of G+M Office & Shed For Mr. Matar In Plot No 89C, Mussafah M17, Abu Dhabi.
• Construction of Workshop and G+M Office Building for Ms, Fast Track Auto Maintenance LLC in Plot No 5330351, Saih Shuaib 04, Dubai.
• Constrction of Garhoud Maintenance Facilty, RTA Dubai.
• B + G + 1 Villa Kailash Villa 2, Jumeira, Dubai
• Sports Hall – Proposed New G+1+Gym Hall UAE Jui Jitsu Federarion Sector Al Bahya Old, Plot # P6, Abu Dhabi

 Client: Dubai South, RTA and various private sector
 Overall Estimated Contract Value: AED 120 Million
 Project Location: Various location in UAE
 Project Summary: All above mentioned tender packages was successfully submitted.

Duties:
• Reporting to the Commercial Director regarding the project to be handled.
• Reviewing the RFP after received from the client, such as tender instructions, contract conditions,
general specifications, particular specifications, drawings, the key milestones if any, BOQ and soil reports.
• Give instructions to the Quantity Surveyors to get the required quantities for selected items in civil, architectural, MEP works and MEP required budget direct cost.
• Sending clarifications for missing items in the BOQ, drawings and specifications, such as in preliminaries, main work items in civil-architecture and MEP.
• Sending inquiry for the sub-contract scope of works such as metals, wood and plastics, thermal moisture and
protection, openings (doors and windows), internal and external finishes, hard and soft landscape, and MEP.
• Prepares comparison statement for the sub-contract scope of works such as metals, wood and plastics, thermal moisture and protection, openings (doors and windows), internal and external finishes, hard and soft landscape.
• Taking full responsibilities in design and build tender packages from takingoff all quantities for civil-structural and architectural items to pricing all the main items. Prepare and review final bid offer letter along with the technical considerations, scope of works, payment terms and final selling BOQ breakdown.
• Prepares budget direct cost estimates for the main contract BOQ such as preliminaries, main work items in civil and architecture using CCS candy software.
• Prepares finalization summary sheet such as supply material cost, supply labor cost, sub-contract cost for civil-architecture and MEP, indirect cost for preliminaries, and overhead and profit.
• Review and check quantities for the items that have a huge cost of impact before finalizing the summary sheet,
in order to secure the contract selling cost.
• Updating day by day the CCS candy master format (all unit cost for civil, structural and architectural) for any new item to be added and to be use for future tender submissions.
• Aside from cost estimation, I can prepare also construction schedule using CCS candy software including the required manhours, histogram and s-curve for the entire main contract items.

Crown Emirates Real Estate LLC/Crown Emirates Contracting LLC/ Crown Engineering Consultancy Bureau LLC,
Abu Dhabi , United Arab Emirates
Sr. Estimation Engineer/ Quantity Surveyor, February 2015 – April 2017

Projects – Pre-contract:
• Proposed Commercial development for Mr. Ali Ahmed Ali Mohammed Al Wehaibi, Abu Dhabi.
• Sports Building of Ports & Airports Security Police Dept and Extension of the Central Warehouse, Abu Dhabi.
• Proposed Commercial development for M/s. Heirs of Mohamed Hilal Bin Fraih Al Qubasisi, Abu Dhabi.
• Commercial & Residential Building for Omeir Real Estate Investment LLC, Abu Dhabi.
• Construction, Completion and Maintenance of Offices, Shops, Workshops and Store Building, Abu Dhabi.
• Design & Build – Accommodation of Violators Detention Building, Al Wathba, Abu Dhabi.
• NFPC Mega Plant in Kizad – District Cooling Plant (TR7,500-TR15,000-TR10,000), Abu Dhabi.
• Construction, Completion and Maintenance of Additional Offices, Building Workshops and Stores, Abu Dhabi.
• Design and Build of 1 BR Mixed Use Apartment Buildings, Manaif, Abu Dhabi.
• Construction of K9 Security Search Administration in Training City, Al Hafar, Abu Dhabi.
• Office Building for Mr. Ahmed Naser Ahmed Al Raisy, Abu Dhabi.
• Dubai Creek Harbour Development – District Cooling Plant DCP-1A (for Civil Works), Dubai.
• Dubai Hills Estate District Cooling Plant DCP-1 (for Civil Works), Dubai.
• Zakher Palace, Villa H.H. Sheikh Hamed Bin Zayed, Al Ain.
• Construction And One Year Maintenance Of Mixed Use Building -Sector RR2 Plot C19, Abu Dhabi.
• Sewerage Treatment Plant Jebel Ali Hills Package 7 – STP (for Civil Works), Dubai.
• Supply, Installation, Testing & Commissioning Of 3 Nos. Of New 132/11kv Substations For Replacement Of Existing Mankhool (Mank), Garhoud (Garh) And Qusais (Ghss) Substations And Associated Works. (For Civil Works), Dubai.
• Al Khail Gate and Mirdif District Cooling Plant (2 Packages for Civil Works), Dubai.
• Residential Apartment & Commercial Building Plot No. SW6-01, C-22, Abu Dhabi.
• Residential Apartment & Commercial Building Plot No. SE6-01, C-13, Abu Dhabi.

 Client: Various clients from the government and private sector.
 Overall Estimated Contract Value: AED 1.12 Billion
 Project Location: Various location in UAE
 Project Summary: Completely submitted tender contract packages with four contract packages awarded.
Duties:
• Reporting to the General Manager regarding the project to be handled.
• Taking off quantities for various tender packages.
• Reviewing the RFP after received from the client, such as tender instructions, contract conditions,
general specifications, particular specifications, drawings, the key milestones if any, BOQ and soil reports.
• Sending clarification for the missing items and requirements to the client or consultants.
• Sending inquiry for the sub-contract scope of works such as metals, wood and plastics, thermal moisture and
protection, openings (doors and windows), internal and external finishes, hard and soft landscape, and MEP.
• Utilizing the direct cost and indirect cost to secure the budget cost of the tender the packages.
• Prepares final estimated contract value, bills of quantities and other documentation.
• Cross checking the rough estimated contract value against the final estimated contract value.
• Review estimates to ensure accuracy, completeness and compliance with defined scope of work.
• Prepares program schedule and work breakdown structure (WBS) as per client required milestones.
• Prepares all the requirements (attach schedules) as per client tendering instructions to complete the tender submission.
• Attending meetings and liaising with general manager on commercial matters.
• Developing strong relationships with the clients and subcontractors.
• Special job for the engineering department, I was tasked to prepare tender analysis, including bidders tender BOQ summary sheets, bidders technical evaluation and value engineering (for selected items that have huge cost of impact).

Projects – Post Contract:
• Ruwais Housing Complex Expansion – Phase Iv District Cooling Plant, Ruwais, Abu Dhabi.
• Adnoc New Corporate Headquarters – District Cooling Plant Design And Build Of Service Building For Adnoc Headquarters, Abu Dhabi.
• Abdullah Omair Villa Extension, Abu Dhabi.
• Office Building for Mr. Ahmed Naser Ahmed Al Raisy, Abu Dhabi.
• Dubai Hills Estate District Cooling Plant DCP-1 (for Civil Works), Dubai.

 Client: ADNOC/Omeir/ADCE/EMAAR
 Overall Project Value: AED 195 Million
 Project Location: Various location in UAE
 Project Summary: Two district cooling plants had been completed for ADNOC
Ruwais and Abu Dhabi, 90% progress for residential villa, 20% progress
for office building and just started DCP project for Dubai Hills Estate of EMAAR.

Duties:
• Reporting to the General Manager regarding the project to be handled.
• Taking off quantities in civil/structural and architectural items based on the latest drawings against the original BOQ.
• Prepares progress payment certificate and detailed work breakdown in monthly basis.
• Review estimates to ensure accuracy, completeness and compliance with defined scope of work.
• Inspecting and then valuing completed work.
• Prepares sub-contractor payments, variation order/change request and cost comparison.
• Prepares final accounts.
• Attending meetings and liaising with general manager on commercial matters.
• Developing strong relationships with the clients and subcontractors.

Al Muhaidib Contracting Co., Jeddah, Kingdom of Saudi Arabia
Quantity Surveyor – Civil Engineer, September 2012 – November 2014

Projects – Post Contract:
• Thuwal Town Development – Phase II
 Client:Saudi Aramco
 Project Value: SAR 1.2 Billion
 Project Location: Thuwal, Kingdom of Saudi Arabia
 Project Summary: Construction of 6 school buildings, medical clinic, 3 mosque buildings, office facilities storm drainage, pipelines, sports facilities, car park, roads and 12 bridges.

• Taibah University Hospital (8 Storey Building)
 Client:Ministry Of Higher Education
 Project Value: SAR 1.32 Billion
 Project Location: Madinah, Kingdom of Saudi Arabia
 Project Summary:Consist of massive civil/structural works, electrical/power distribution, instrumentation, telecommunication, massive architectural works, water piping distribution system, mechanical distribution system and waste disposal distributionsystem.

• Umm Al Qura University
 Client:Ministry Of Higher Education
 Project Value: SAR 800 million
 Project Location: Makka, Kingdom of Saudi Arabia
 Project Summary:Consist of massive civil/structural works, electrical/power distribution, instrumentation, telecommunication, massive architectural works, water pipingdistribution system, mechanical distribution system and waste disposal distribution system.

• International Convention Center
 Client:Ministry Of Finance
 Project Value: SAR 1 Billion
 Project Location: Madinah, Kingdom of Saudi Arabia
 Project Summary:Consist of massive civil/structural works, electrical/power distribution, instrumentation, telecommunication, massive architectural works, water pipingdistribution system, mechanical distribution system, waste disposal distributionsystem, car park access road, landscaping and underground tunnel.

Duties:
• Reporting to the Head of Contracts, Subcontract Manager and Senior Claims Engineer regarding the job to be handled.
• Responsible for carrying out geometric layouts, horizontal and vertical alignments, site grading, grade
junctions and grade separated interchanges using Civil 3D.
• Prepares earthworks tabulation in all roads and site preparation in accordance with the actual survey data against the design elevation stated in the plans/specifications using Civil 3D.
• Prepares material take off (MTO) in all various contract packages under civil/structural discipline in accordance with
the plans/specifications stated the following project title below.
• Prepares various sub-contract bill of quantities for the sub-contractors.
• Preparing tender and contract documents, including bills of quantities with the architect and/or the client.
• Allocating work to subcontractors.
Occasionally assigned to prepare various subcontractor payments.
• Valuing completed work and arranging payments.
• Review estimates to ensure accuracy, completeness and compliance with defined scope of work.
• Support technically in review of design packages and drawings.
• Study and interpret engineering drawing and technical specifications to develop construction process flows.
• Develop time-phase charts and learning curves for construction phase by phase.

Radicon Gulf Consult-Kentz Eng’g Int’l Ltd. (RGCK consulting engineers), Al-khobar, Kingdom of Saudi Arabia
Quantity Surveyor/Cost Engineer, June 2011 – August 2012

Projects – Pre-Contract:
• Detailed Engineering Design for Jubail 2 Stage 3 and Detailed Engineering Design for Residential Expansion & Construction of Buildings.
 Client: Royal Commission For Jubail And Yanbu (RCJY)
 Overall Estimated Contract Value: SAR 3.05 Billion
 Project Location: Jubail, Kingdom of Saudi Arabia
 Project Summary: Detailed engineering design for residential expansion, construction of buildings, storm drainage, landmark bridges, underground tunnels, freeway/expressways,oil/gas pipelines, potable water tanks, massive underground oil tanks, railways, underground power/telecom distribution system, transmission lines, landmark highway interchanges, desalination plant, massive pipe racks and potable water pipelines.
Duties:
• Reporting to the Lead Quantity Surveyor regarding the project to be handled.
• Coordination through the lead engineers in different discipline such as civil, structural, architectural, mechanical, electrical, telecommunication and instrumentation.
• Prepares MTO, detailed cost estimate and cost estimate (BOQ) in all various contract packages.
• Preparing for submission from 10%, 30%, 60%, 90%, 100% and IFC in all various contract packages.
• Prepares work request (designed changed notice (DCN)) or change order from the awarded contract packages and addendums.
• Conducting feasibility studies to estimate materials, time and labor costs.
• Coordination of work effort.
• Develop and verify MTOs, equipment and bulk quantities against P&IDs and drawings.
• Develop multi-discipline concepts, detailed and definitive cost estimates.
• Interact with multiple organizations to review, discuss project scope and estimate basis and consult on company estimating methods/procedures.
• Collaborate with design engineers to determine machining operations, tools, gauges and materials required for the job.

Abdulrahman M. Al-Shalawi Est., Al-khobar, Kingdom of Saudi Arabia
Quantity Surveyor/Cost Estimator, May 2009 – May 2011

Projects – Post Contract:
• Jubail Export Refinery Project (JERP)
 Client: Saudi Aramco-Total Refining & Petrochemical Co. (SATORP)
 Project Value: SAR 300 Million
 Project Location: Jubail-2 Industrial City, Kingdom of Saudi Arabia
 Project Summary: Site preparation, heavy roads, bridges, pipelines, perimeter fence, storm drainage, potable water tanks, informative signs, power distribution, telecommunication linesand architectural landscaping.

• Manifa Site Preparation And Highway Bridges
 Client: Saudi Aramco
 Project Value: SAR 500 Million
 Project Location: Manifa, Kingdom of Saudi Arabia
 Project Summary:Site preparation, heavy/coastal roads, 4 highway bridge interchanges, pipelines, perimeter fence, storm drainage, potable water tanks, informative signs, power distribution, telecommunication lines, underground tunnels, helipad,and architectural landscaping.

• IMPROVEMENT OF PORT EASTHERN STORAGE AREA
 Client: Ports Authority
 Project Value: SAR 100 Million
 Project Location: Dammam, Kingdom of Saudi Arabia
 Project Summary:Reclamation, roads, bridges, storm drainage, informative signs and architectural landscape.

Duties:
• Coordination through the project manager and the QS of our consultant which is the project management team (PMT) for plans, specification and quantities.
• Responsible for carrying out geometric layouts, horizontal and vertical alignments, site grading, grade junctions and grade separated interchanges design using Autocad Civil 3D.
• Preparing the earthworks calculations against the original contract quantity in all roads and site preparation using Autocad Civil 3D.
• Assigned to crashed/revised the bar-chart schedule in order to eliminate the negative slippage.
• To quantify the actual accomplishment versus the original bill of quantities of a contract package.
• Occassionally assigned to prepared the construction schedule (bar-chart, s-curve & cash flow) in different project packages.
• Prepares monthly progress payments invoice and various subcontractor payments.
• Prepares variation order as per client instructions and procedures.

All Asia Structures, Inc., Dagat-dagatan Ave., San Rafael, Navotas, Metro Manila, Philippines
Site Quantity Engineer, October 2008 – April 2009

Projects – Post Contract:
• Pre-heater Building and Clinker Silo Building
 Client: Eagle Cement Corporation
 Project Value: PHP 280 Million
 Project Location: San Ildefonso, Bulacan, Philippines
 Project Summary:Massive Concrete Foundation, Structural Steel Framing Total Floor – 8th w/ 120m Total Height for Pre-heater and massive concrete foundation, solid concrete walls for clinker silo.

Duties:
• Coordination through the Project manager for the plans, specification and other pertinent documents.
• Responsible for reviewing the structural plans, specification and other document in order to get the exact material quantity needed to use while the project is ongoing.
• Oversee land surveys for the foundation of the structures in order to get the zero elevation, evaluate and recommend building and construction materials, calculate and cost estimates.
• Responsible for the quantity cost control, in order not to exceed the estimated cost per item of the project.
• Established and monitored construction work schedules in accordance of projected bar-chart s-curve schedule for monthly work basis in order not to delay the target schedule.
• Prepares monthly progress payments invoice and various subcontractor payments.
• Prepares variation order as per client instructions and procedures.

Vicente T. Lao Construction Corporation, Nabilid, Roxas, Zamboanga del Norte Branch, Philippines
Project/Field Engineer, March 2006 – September 2008

Projects – Post Contract:
• Improvement/Rehabilitation of Dipolog – Sindangan – Liloy – Ipil Road, Lipakan – Salug section, Zamboanga Del Norte Station Limit (Km. 1952 + 155 – Km. 1958 + 889) with Exception
• Improvement/Rehabilitation of Dipolog – Sindangan – Liloy – Ipil Road, Talinga – Bacungan Section Zamboanga Del NorteStation Limit (Km. 1929 + 234 – Km. 1934 + 044) with Exception
• Improvement/Rehabilitation of Liloy – Ipil Road, Junction San Isidro – Liloy – Tampilisan Boundary, Zamboanga Del NorteStation Limit (Km. 1972 + 500 – Km. 1976 + 200) with Exception
• Improvement/Rehabilitation of Dapitan – Dakak – Rizal Coastal Loop Road Brgy.Linabo – Balubohan, Rizal Section Zamboanga del NorteStation Limit (Km. 1801 + 599 – Km. 1811 + 000) with Exception
• Improvement/Rehabilitation of Dapitan –– Dakak-Rizal Coastal Loop National Road,Brgy. Nilabo – Nangca-an,Rizal Section Zamboanga del NorteStation Limit (Km.1797 + 099 to Km. 1801 + 599) w/ Exception
• Repair/Maintenance Rehabilitation of National Roads along Sindangan- Liloy Road Bacungan-Manil Section Zamboanga del NorteStation Limit (Km. 1934 + 000 – Km. 1936 + 000) with Exception
 Client: Department of Public Works and Highways
 Overall Project Value: PHP142 Million
 Project Location: Zamboanga Del Norte, Philippines
 Project Summary:Repair of Damaged Asphalt, Road Shoulder Correction, Asphalt Overlay, Miscellaneous Structure, Sub-grade Preparation (Reshaping of Existing Unpaved Roadway), Roadway Re- gravelling, Guardrail and Warning Sign Installation

Duties:
• Coordination thru the project manager and the representatives of the Zamboanga del Norte Engineering Districts (DPWH) for the plans, specifications and other pertinent document of the project.
• Supervise the overall implementation of the project.
• Implementing proper safekeeping of construction materials, and equipments to avoid pilferage.
• Implementing for the safety and health program of the project.
• Prepares revised construction schedule of activities reflecting manpower, equipments and materials requirement.

Primary Structure Consulting Engineers, Bonifacio Ave., Quezon City, Metro Manila, Philippines
Jr. Civil/Structural Design Engineer, January 2004 – March 2006

Duties:
• Preparing for the design of 4-Storey Commercial Building located at Pasay City, Phil… Work involves framing, loading calculations, design and analysis of the structure using Staadpro2006. Design of roof steel trusses and Foundation design using Staadpro2006.
• Preparing for the design of slabs, stair, beams, columns and foundation for a 2,059 sq.m using staadpro2006. Two Storey office building located at Sumulong, Antipolo City.
• Preparing for the design and analysis of bridge structure (sub-structure and super-structure) using both Microsoft Excel and SAP2000.
• Estimates materials to be used in the construction. Computes number of bars needed for reinforcement. Computes number of gallons of paint to be used in coating a certain room. Computes the volume of cement needed in the design.

*Professional references will be provided upon request.